Installation Advice

  • As with all DPC systems, purpose made units should always be bedded onto fresh mortar and never dry bedded
  • The masonry laid over the DPC and purpose made unit should also be bedded onto fresh mortar, so that the DPC system is approximately half way through the thickness of the mortar joint
  • Continuation of DPC must be lapped on to the purpose made unit by a minimum of 100mm